---
schema_version: "secwatch.filing_event.v1"
accession: "0001628280-24-031689"
form_type: "8-K"
ticker: "GREE"
cik: "0001844971"
company_name: "Greenidge Generation Holdings Inc."
filed_at: "2024-07-11T23:59:59+00:00"
generated_at: "2026-05-31T21:50:13.141136+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.65
calibrated_materiality_score: 0.65
confidence: "high"
source: SEC EDGAR
---

# Greenidge launches Mississippi bitcoin mining site with 2,400 miners, introduces Pod X infrastructure

## Summary
- Mississippi site went live July 1 with 2,400 deployed miners; plans to expand power access to at least 25 MW in 12 months.
- Launched proprietary Greenidge Pod X mining pod with 792-miner capacity (35% more than competitors) and low $/kW cost.
- Total power capacity now 122 MW across four active bitcoin mining sites; 8,000 miners in operation.
- Expects to deploy first Antminer S21 Pro miners in coming weeks; also acquired 60 MW in South Carolina and 7.5 MW in North Dakota.

## SEC filing metadata
- accession: 0001628280-24-031689
- form_type: 8-K
- ticker: GREE
- cik: 0001844971
- company_name: Greenidge Generation Holdings Inc.
- filed_at: 2024-07-11T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.65
- calibrated_materiality_score: 0.65
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1844971/000162828024031689/0001628280-24-031689-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1844971/000162828024031689/gree-20240711.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001628280-24-031689
- JSON: https://secwatch.observer/filing/0001628280-24-031689.json
- Plain text: https://secwatch.observer/filing/0001628280-24-031689.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
