---
schema_version: "secwatch.filing_event.v1"
accession: "0001628280-26-015246"
form_type: "8-K"
ticker: "GREE"
cik: "0001844971"
company_name: "Greenidge Generation Holdings Inc."
filed_at: "2026-03-05T23:59:59+00:00"
generated_at: "2026-05-15T19:52:00.187434+00:00"
event_type: "earnings"
sentiment: "positive"
materiality_score: 0.85
calibrated_materiality_score: 0.85
confidence: "high"
source: SEC EDGAR
---

# Greenidge FY2025 net income $4.2-5.2M, debt cut to $39M, NYSDEC permit secured

## Summary
- FY2025 total revenue $58.8M (down $0.8M YoY); net income $4.2-5.2M vs FY2024 net loss (improvement of $24-25M).
- Outstanding senior unsecured debt reduced to $39.0M as of Dec 31, 2025 from $68.5M at FY2024.
- Secured agreement with NYSDEC to issue final five-year Title V Air Permit for Dresden facility, ending litigation.
- Secured 100MW future power capacity: 60MW at Dresden (grid), 40MW in Mississippi by Q1 2027; exploring AI/HPC datacenter development.

## SEC filing metadata
- accession: 0001628280-26-015246
- form_type: 8-K
- ticker: GREE
- cik: 0001844971
- company_name: Greenidge Generation Holdings Inc.
- filed_at: 2026-03-05T23:59:59+00:00
- event_type: earnings
- sentiment: positive
- materiality_score: 0.85
- calibrated_materiality_score: 0.85
- confidence: high
- sec_items: 2.02, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1844971/000162828026015246/0001628280-26-015246-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1844971/000162828026015246/gree-20260305.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001628280-26-015246
- JSON: https://secwatch.observer/filing/0001628280-26-015246.json
- Plain text: https://secwatch.observer/filing/0001628280-26-015246.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
