{"schema_version":"secwatch.filing_event.v1","accession":"0001628280-26-027645","form_type":"8-K","ticker":"CORZ","cik":"0001839341","company_name":"Core Scientific, Inc./tx","filed_at":"2026-04-27T23:59:59+00:00","discovered_at":"2026-05-14T18:02:33.083975+00:00","generated_at":"2026-05-15T03:56:26.667822+00:00","sec_items":["7.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.75,"confidence":"high","headline":"Core Scientific plans to scale Pecos campus to 1.5 GW gross power","bullets":["Plans to expand Pecos, TX campus to approx. 1.5 GW gross power / 1.0 GW leasable power.","Currently 300 MW used for bitcoin mining; transforming site into AI data center campus.","First data hall reached construction milestone; precast walls arriving; initial capacity expected early 2027.","Secured incremental 300 MW under contract with utility; also developed behind-the-meter solution for more capacity.","Acquired more than 200 acres of land to support expansion."],"urls":{"canonical":"https://secwatch.observer/filing/0001628280-26-027645","json":"https://secwatch.observer/filing/0001628280-26-027645.json","markdown":"https://secwatch.observer/filing/0001628280-26-027645.md","text":"https://secwatch.observer/filing/0001628280-26-027645.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1839341/000162828026027645/0001628280-26-027645-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1839341/000162828026027645/core-20260427.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-15T03:56:26.667822+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}