---
schema_version: "secwatch.filing_event.v1"
accession: "0001628280-26-059707"
form_type: "8-K"
ticker: "FRVO"
cik: "0001853868"
company_name: "Fervo Energy Co"
filed_at: "2026-09-01T12:05:12+00:00"
generated_at: "2026-09-01T12:10:10.324721+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.85
calibrated_materiality_score: 0.85
confidence: "high"
source: SEC EDGAR
---

# Fervo signs 396 MW geothermal PPA with Google; expansion option to ~950 MW

## Summary
- 396 MW PPA with Google for Cape Station EGS project in Utah; 4 tranches of 99 MW, COD from Q3 2028.
- 15-year delivery term; parent guarantees from Fervo and Alphabet.
- Option for ~600 MW expansion, total ~950 MW by June 2030, subject to agreement.
- Project uses SB132 flexible delivery pathways; regulatory approvals pending.
- Press release dated Sept 1, 2026; deal is world's largest enhanced geothermal PPA.

## SEC filing metadata
- accession: 0001628280-26-059707
- form_type: 8-K
- ticker: FRVO
- cik: 0001853868
- company_name: Fervo Energy Co
- filed_at: 2026-09-01T12:05:12+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.85
- calibrated_materiality_score: 0.85
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1853868/000162828026059707/0001628280-26-059707-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1853868/000162828026059707/frvo-20260826.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001628280-26-059707
- JSON: https://secwatch.observer/filing/0001628280-26-059707.json
- Plain text: https://secwatch.observer/filing/0001628280-26-059707.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
