secwatch.observer — SEC 8-K summary ====================================== Issuer: Standard Nuclear, Inc. (STDN) CIK: 0002086716 Form: 8-K Filed at: 2026-11-23T14:05:27+00:00 Accession: 0001628280-26-075381 Event type: regulatory Sentiment: positive Materiality: 0.60 Item codes: 8.01, 9.01 LLM model: deepseek-v4.1-flash:cloud@v2 Standard Nuclear files final safety analyses with DOE for SN-TN and SN-ID TRISO fuel plants -------------------------------------------------------------------------------- - DSA for SN-TN submitted November 6, 2026; DSA for SN-ID submitted November 12, 2026; both Hazard Category 2 facilities now await DOE review and approval. - DOE approved the Preliminary DSAs for both facilities in July 2026; SN-ID follows the same design construct as SN-TN, allowing near-simultaneous submissions. - Company says DSA approval would be a critical milestone positioning it to fulfill existing 2027 fuel production orders. - Existing operations: DOE-authorized HALEU TRISO production at SN-0 in Oak Ridge, Tennessee, plus NRC approval for TRISO production in Richland, Washington via the Framatome joint venture. - CEO Kurt Terrani said bringing SN-TN and SN-ID online would significantly expand capacity and create a geographically distributed fuel supply chain. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/2086716/000162828026075381/0001628280-26-075381-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/2086716/000162828026075381/stdn-20261112.htm HTML page: https://secwatch.observer/filing/0001628280-26-075381 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer