{"schema_version":"secwatch.filing_event.v1","accession":"0001637880-24-000021","form_type":"8-K","ticker":null,"cik":"0001637880","company_name":"Tri-State Generation & Transmission Association, Inc.","filed_at":"2024-03-20T23:59:59+00:00","discovered_at":"2026-05-14T18:03:24.935893+00:00","generated_at":"2026-06-04T11:41:15.766906+00:00","sec_items":["1.01","9.01"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.55,"calibrated_materiality_score":0.55,"confidence":"high","headline":"Tri-State enters $195.6M EPC contract for 145 MW solar project in Colorado","bullets":["Turnkey EPC contract with JSI Construction Group for 145 MW AC solar facility in Moffat County, Colorado.","Total contract price of $195,611,863, payable via milestone schedule; first payment due upon notice to proceed.","Project expected to achieve commercial delivery by December 31, 2025; liquidated damages for delay.","Notice to proceed to be issued by June 1, 2024; EPC contractor responsible for full construction except transformer.","Tri-State separately acquiring project assets from Axial Basin Solar LLC via Asset Purchase Agreement dated same day."],"urls":{"canonical":"https://secwatch.observer/filing/0001637880-24-000021","json":"https://secwatch.observer/filing/0001637880-24-000021.json","markdown":"https://secwatch.observer/filing/0001637880-24-000021.md","text":"https://secwatch.observer/filing/0001637880-24-000021.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1637880/000163788024000021/0001637880-24-000021-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1637880/000163788024000021/tris-20240315.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-04T11:41:15.766906+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"689242624a213836fb0dc43a6b77507b7b1cdadc","claim":"Tri-State Generation & Transmission Association, Inc. entered into Turnkey Engineering, Procurement and Construction Contract (Axial Basin Solar Project) with JSI Construction Group LLC valued at $195,611,863.00 (effective 2024-03-15).","evidence_excerpt":"On March 15, 2024, Tri-State Generation and Transmission Association, Inc. (“Tri-State”) and JSI Construction Group LLC (“EPC Contractor”) entered into a Turnkey Engineering, Procurement and Construction Contract (Axial Basin Solar Project) (“Axial EPC”) for the construction of a 145 MW AC solar energy generation system to be located in Moffat County, Colorado (“Project”).","evidence_source":"SEC 8-K Item 1.01/1.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1637880/000163788024000021/0001637880-24-000021-index.htm","confidence":0.9,"family_label":"Material Agreements","details":[{"label":"Action","value":"entry"},{"label":"Agreement","value":"supply"},{"label":"Counterparty","value":"JSI Construction Group LLC"},{"label":"Value","value":"$195,611,863.00"},{"label":"Effective","value":"2024-03-15"}],"fact_type":"material_agreement"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}