other_material
confidence high
sentiment positive
materiality 0.70
NexMetals drills 13.5m of 3.68% CuEq at Selebi North, extends mineralization 315m down-plunge
NexMetals Mining Corp.
- SNUG-25-184 intersected 13.50m of 3.68% CuEq (1.13% Cu, 1.24% Ni) on South Limb, 183m down-plunge of 2024 MRE.
- SNUG-25-185 returned 5.95m of 4.14% CuEq (2.87% Cu, 0.62% Ni) on N2 Limb, 65m down-dip of MRE.
- South Limb mineralization extended 315m down-plunge beyond 2024 resource model, with BHEM confirming open at depth.
- 37,113 metres in 85 holes drilled outside the current MRE, with assays pending for additional holes.
- CEO Morgan Lekstrom cites step-out success validating system potential; drilling continues with hole SNUG-25-190.
item 7.01item 9.01