---
schema_version: "secwatch.filing_event.v1"
accession: "0001641172-25-025468"
form_type: "8-K"
ticker: "SLNH"
cik: "0000064463"
company_name: "Soluna Holdings, Inc"
filed_at: "2025-08-26T23:59:59+00:00"
generated_at: "2026-05-17T10:06:04.548960+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# Soluna reaches 1 GW clean computing projects pipeline; launches two new Texas sites

## Summary
- 1 GW milestone: Project Fei (100 MW solar co-located with 240 MW solar farm) and Project Gladys (150 MW wind co-located with 226 MW wind farm) launched in Texas.
- Total development pipeline reaches 2.8 GW; projects span operation, construction, and development stages.
- Projects partnered with global energy infrastructure investor and U.S. IPP managing over $40B in assets.
- CEO states milestone puts Soluna on par with Amazon, Meta, Google in clean-powered computing capacity.
- Company estimates displacing ~48M metric tons of CO₂ over asset life, equivalent to removing 11M cars.

## SEC filing metadata
- accession: 0001641172-25-025468
- form_type: 8-K
- ticker: SLNH
- cik: 0000064463
- company_name: Soluna Holdings, Inc
- filed_at: 2025-08-26T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/64463/000164117225025468/0001641172-25-025468-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/64463/000164117225025468/form8-k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001641172-25-025468
- JSON: https://secwatch.observer/filing/0001641172-25-025468.json
- Plain text: https://secwatch.observer/filing/0001641172-25-025468.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
