secwatch.observer — SEC 8-K summary ====================================== Issuer: UR-ENERGY INC (URG) CIK: 0001375205 Form: 8-K Filed at: 2022-12-05T23:59:59+00:00 Accession: 0001654954-22-016129 Event type: other_material Sentiment: positive Materiality: 0.65 Item codes: 8.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Ur-Energy completes Phase 1 field tests of patented well tech: 75% rig time reduction, 85% casing cost cut -------------------------------------------------------------------------------- - Phase 1 field tests at Lost Creek ISR Facility show injection wells with new tech cut drill rig time by 75% and casing cost by 85%. - Overall cost reduction to install an injection well is estimated at $2.50-$3.50 per pound of U3O8 produced, up to 49% savings. - Environmental benefits include 85% fewer air emissions, reduced heavy vehicle traffic, and less noise from shortened rig time. - Phase 2 testing will focus on well development methods and flow rates; company plans to license technology to other industries. - Company expects to file report with Wyoming DEQ for final permitting; hydrologic modeling to optimize well pattern geometry. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1375205/000165495422016129/0001654954-22-016129-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1375205/000165495422016129/urg_8k.htm HTML page: https://secwatch.observer/filing/0001654954-22-016129 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer