other material
confidence high
sentiment positive
materiality 0.65
DynaResource discloses $7.3M 2023 capex plan and high-grade drilling intercepts from San Jose de Gracia campaign
DYNARESOURCE, INC.
- 2023 projected capex of $7.3M: $2.5M for San Pablo mine, $3.1M for exploration drilling, $1.2M facilities, $0.5M electrical line.
- San Pablo Sur hole SJG22-421: 6.45m @ 119.30 g/t Au, including 2.25m @ 335.51 g/t Au.
- Tres Amigos hole SJG21-308: 2.50m @ 106.37 g/t Au (cut 2.00m @ 131.58 g/t Au).
- Drilling across six areas (Tres Amigos, La Union, San Pablo, San Pablo Sur, Palos Chinos, Tepeh-Ceceña) with numerous high-grade intercepts.