---
schema_version: "secwatch.filing_event.v1"
accession: "0001654954-24-001305"
form_type: "8-K"
ticker: "PED"
cik: "0001141197"
company_name: "PEDEVCO CORP"
filed_at: "2024-02-05T23:59:59+00:00"
generated_at: "2026-06-06T08:58:30.672637+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# PEDEVCO gets Colorado ECMC approval for 11-well D-J Basin development; drilling Q2 2024

## Summary
- ECMC approved Roth 2-11 OGDP covering 2,560 acres for up to 11 horizontal Niobrara wells in Weld County, CO on Jan 31, 2024.
- Drilling operations to commence in Q2 2024; initial production expected in second half of 2024.
- Multi-well pad directly offsets recently successful non-operated development in the D-J Basin.

## SEC filing metadata
- accession: 0001654954-24-001305
- form_type: 8-K
- ticker: PED
- cik: 0001141197
- company_name: PEDEVCO CORP
- filed_at: 2024-02-05T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1141197/000165495424001305/0001654954-24-001305-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1141197/000165495424001305/ped_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001654954-24-001305
- JSON: https://secwatch.observer/filing/0001654954-24-001305.json
- Plain text: https://secwatch.observer/filing/0001654954-24-001305.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
