{"schema_version":"secwatch.filing_event.v1","accession":"0001654954-24-003176","form_type":"8-K","ticker":"URG","cik":"0001375205","company_name":"UR-ENERGY INC","filed_at":"2024-03-14T23:59:59+00:00","discovered_at":"2026-05-14T18:03:23.988754+00:00","generated_at":"2026-06-04T19:06:35.429578+00:00","sec_items":["8.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"Ur-Energy decides to build Shirley Basin ISR uranium mine; 24-month construction plan","bullets":["Decision to build-out wholly-owned Shirley Basin ISR uranium mine in Carbon County, Wyoming; all major permits in place.","Satellite plant with ion exchange, wastewater and groundwater restoration circuits; construction estimated at 24 months.","Detailed economic analysis in Technical Report Summary filed with 2023 Form 10‑K/A on March 12, 2024.","Timing projections subject to supply chain, labor and other variables; forward-looking statements caution."],"urls":{"canonical":"https://secwatch.observer/filing/0001654954-24-003176","json":"https://secwatch.observer/filing/0001654954-24-003176.json","markdown":"https://secwatch.observer/filing/0001654954-24-003176.md","text":"https://secwatch.observer/filing/0001654954-24-003176.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1375205/000165495424003176/0001654954-24-003176-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1375205/000165495424003176/urg_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-04T19:06:35.429578+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}