{"schema_version":"secwatch.filing_event.v1","accession":"0001654954-24-004966","form_type":"8-K","ticker":"URG","cik":"0001375205","company_name":"UR-ENERGY INC","filed_at":"2024-04-24T23:59:59+00:00","discovered_at":"2026-05-14T18:03:18.146949+00:00","generated_at":"2026-06-03T09:27:21.367121+00:00","sec_items":["2.02","9.01"],"event_type":"earnings","sentiment":"neutral","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"high","headline":"Ur-Energy cuts 2024 production guidance, repays bond loan, approves Shirley Basin satellite","bullets":["2024 production guidance reduced to 550,000–650,000 lbs U3O8 captured; Q1 captured 38,221 lbs.","Prepaid remaining $4.4M state bond loan on March 27; now debt-free; cash $53.9M at March 31.","Shirley Basin satellite facility approved; capital cost ~$24.4M, capacity up to 1.0M lbs/yr, expected 2026.","Two new uranium sales agreements for 2026-2030; sold 75,000 lbs post-quarter for $4.6M.","Lost Creek ramp-up continues; two new header houses coming online in 2024."],"urls":{"canonical":"https://secwatch.observer/filing/0001654954-24-004966","json":"https://secwatch.observer/filing/0001654954-24-004966.json","markdown":"https://secwatch.observer/filing/0001654954-24-004966.md","text":"https://secwatch.observer/filing/0001654954-24-004966.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1375205/000165495424004966/0001654954-24-004966-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1375205/000165495424004966/urg_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-03T09:27:21.367121+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"49de85e8d67c301b2306771acb7a27e6795f32de","claim":"UR-ENERGY INC updated its quarter ended March 31, 2024 guidance (lowered).","evidence_excerpt":"Meanwhile, ramp-up continues at Lost Creek with additional development and production leading to another shipment of yellowcake being made this month. We continue to overcome ramp-up challenges. Due to those challenges, we are updating and reducing our 2024 production guidance to 550,000 – 650,000 pounds captured.","evidence_source":"SEC 8-K Item 2.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1375205/000165495424004966/0001654954-24-004966-index.htm","confidence":0.9,"family_label":"Earnings Releases","details":[{"label":"Period","value":"quarter ended March 31, 2024"},{"label":"Guidance","value":"lowered"},{"label":"Result","value":"reported results"}],"fact_type":"earnings_release"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}