---
schema_version: "secwatch.filing_event.v1"
accession: "0001654954-24-004966"
form_type: "8-K"
ticker: "URG"
cik: "0001375205"
company_name: "UR-ENERGY INC"
filed_at: "2024-04-24T23:59:59+00:00"
generated_at: "2026-06-03T09:27:21.367121+00:00"
event_type: "earnings"
sentiment: "neutral"
materiality_score: 0.7
calibrated_materiality_score: 0.7
confidence: "high"
source: SEC EDGAR
---

# Ur-Energy cuts 2024 production guidance, repays bond loan, approves Shirley Basin satellite

## Summary
- 2024 production guidance reduced to 550,000–650,000 lbs U3O8 captured; Q1 captured 38,221 lbs.
- Prepaid remaining $4.4M state bond loan on March 27; now debt-free; cash $53.9M at March 31.
- Shirley Basin satellite facility approved; capital cost ~$24.4M, capacity up to 1.0M lbs/yr, expected 2026.
- Two new uranium sales agreements for 2026-2030; sold 75,000 lbs post-quarter for $4.6M.
- Lost Creek ramp-up continues; two new header houses coming online in 2024.

## SEC filing metadata
- accession: 0001654954-24-004966
- form_type: 8-K
- ticker: URG
- cik: 0001375205
- company_name: UR-ENERGY INC
- filed_at: 2024-04-24T23:59:59+00:00
- event_type: earnings
- sentiment: neutral
- materiality_score: 0.7
- calibrated_materiality_score: 0.7
- confidence: high
- sec_items: 2.02, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1375205/000165495424004966/0001654954-24-004966-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1375205/000165495424004966/urg_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001654954-24-004966
- JSON: https://secwatch.observer/filing/0001654954-24-004966.json
- Plain text: https://secwatch.observer/filing/0001654954-24-004966.txt

## Key facts
- Earnings Releases
  UR-ENERGY INC updated its quarter ended March 31, 2024 guidance (lowered).
  - Period: quarter ended March 31, 2024
  - Guidance: lowered
  - Result: reported results
  source text: Meanwhile, ramp-up continues at Lost Creek with additional development and production leading to another shipment of yellowcake being made this month. We continue to overcome ramp-up challenges. Due to those challenges, we are updating and reducing our 2024 production guidance to 550,000 – 650,000 pounds captured.
  evidence_url: https://www.sec.gov/Archives/edgar/data/1375205/000165495424004966/0001654954-24-004966-index.htm

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
