---
schema_version: "secwatch.filing_event.v1"
accession: "0001654954-24-012107"
form_type: "8-K"
ticker: "URG"
cik: "0001375205"
company_name: "UR-ENERGY INC"
filed_at: "2024-09-19T23:59:59+00:00"
generated_at: "2026-05-31T03:32:58.668455+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# Ur-Energy revises 2024 production guidance to 325k-475k lbs U3O8; Lost Creek ramp slower

## Summary
- 2024 production guidance lowered to 325,000-475,000 lbs U3O8 captured due to slower-than-expected ramp-up from manpower issues.
- Average production solution headgrade in August was 67.1 mg/L; fifth yellowcake shipment arrived at conversion facility on Sept 11.
- Five header houses brought online at Lost Creek in 2024; HH2-10 online mid-August, HH2-11 expected in September.
- Shirley Basin monitor well installation complete (120 wells); construction on schedule with completion expected late 2025.
- 15 drill rigs at Lost Creek (plus 3 at Shirley Basin); deep disposal well #5 operational.

## SEC filing metadata
- accession: 0001654954-24-012107
- form_type: 8-K
- ticker: URG
- cik: 0001375205
- company_name: UR-ENERGY INC
- filed_at: 2024-09-19T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 2.02, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1375205/000165495424012107/0001654954-24-012107-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1375205/000165495424012107/urg_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001654954-24-012107
- JSON: https://secwatch.observer/filing/0001654954-24-012107.json
- Plain text: https://secwatch.observer/filing/0001654954-24-012107.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
