secwatch.observer — SEC 8-K summary ====================================== Issuer: UR-ENERGY INC (URG) CIK: 0001375205 Form: 8-K Filed at: 2024-09-19T23:59:59+00:00 Accession: 0001654954-24-012107 Event type: other_material Sentiment: neutral Materiality: 0.60 Item codes: 2.02, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Ur-Energy revises 2024 production guidance to 325k-475k lbs U3O8; Lost Creek ramp slower -------------------------------------------------------------------------------- - 2024 production guidance lowered to 325,000-475,000 lbs U3O8 captured due to slower-than-expected ramp-up from manpower issues. - Average production solution headgrade in August was 67.1 mg/L; fifth yellowcake shipment arrived at conversion facility on Sept 11. - Five header houses brought online at Lost Creek in 2024; HH2-10 online mid-August, HH2-11 expected in September. - Shirley Basin monitor well installation complete (120 wells); construction on schedule with completion expected late 2025. - 15 drill rigs at Lost Creek (plus 3 at Shirley Basin); deep disposal well #5 operational. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1375205/000165495424012107/0001654954-24-012107-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1375205/000165495424012107/urg_8k.htm HTML page: https://secwatch.observer/filing/0001654954-24-012107 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer