{"schema_version":"secwatch.filing_event.v1","accession":"0001674335-23-000004","form_type":"8-K","ticker":"JELD","cik":"0001674335","company_name":"JELD-WEN Holding, Inc.","filed_at":"2023-01-26T23:59:59+00:00","discovered_at":"2026-05-14T18:03:46.092144+00:00","generated_at":"2026-06-20T08:16:45.372143+00:00","sec_items":["2.05"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.55,"calibrated_materiality_score":0.55,"confidence":"high","headline":"JELD-WEN to close Atlanta plant; restructuring costs ~$19M, annual savings ~$11M","bullets":["Plan to close manufacturing facility in Atlanta, GA to optimize footprint and drive operational efficiencies.","Pre-tax restructuring costs of approximately $19M, substantially all by end of Q3 2023.","Cash items expected to be ~$15M, including ~$3M of capital expenditures.","Annual cost savings estimated at ~$11M upon completion of the Plan.","Plan expected to be substantially completed by end of Q3 2023."],"urls":{"canonical":"https://secwatch.observer/filing/0001674335-23-000004","json":"https://secwatch.observer/filing/0001674335-23-000004.json","markdown":"https://secwatch.observer/filing/0001674335-23-000004.md","text":"https://secwatch.observer/filing/0001674335-23-000004.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1674335/000167433523000004/0001674335-23-000004-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1674335/000167433523000004/jeld-20230126.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-20T08:16:45.372143+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"22542058eefe428d50c2e6f65e11ec26d379706a","claim":"JELD-WEN Holding, Inc. announced a restructuring with charges of approximately $19 million affecting manufacturing facility in Atlanta, Georgia.","evidence_excerpt":"On January 26, 2023, JELD-WEN Holding, Inc. (the “Company”) announced to employees a restructuring plan to close a manufacturing facility in Atlanta, Georgia in a continuing effort to optimize the Company’s footprint and drive operational efficiencies (the “Plan”). The Company expects to incur pre-tax restructuring expenses, other closure costs and capital spending, including building restoration, equipment relocation and employee-related costs, of approximately $19 million, substantially all of which are expected to be incurred by the end of the third quarter of 2023.","evidence_source":"SEC 8-K Item 2.05/2.06","evidence_url":"https://www.sec.gov/Archives/edgar/data/1674335/000167433523000004/0001674335-23-000004-index.htm","confidence":0.9,"family_label":"Restructurings & Charges","details":[{"label":"Type","value":"restructuring"},{"label":"Charge","value":"approximately $19 million"},{"label":"Affected area","value":"manufacturing facility in Atlanta, Georgia"}],"fact_type":"restructuring_charge"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}