{"schema_version":"secwatch.filing_event.v1","accession":"0001683168-22-001522","form_type":"8-K","ticker":"AHNRF","cik":"0001304409","company_name":"ATHENA GOLD CORP","filed_at":"2022-03-08T23:59:59+00:00","discovered_at":"2026-05-14T18:04:05.845134+00:00","generated_at":"2026-06-27T00:40:29.955897+00:00","sec_items":["7.01","9.01"],"event_type":"other","sentiment":"positive","materiality_score":0.4,"calibrated_materiality_score":0.4,"confidence":"high","headline":"Athena Gold secures contractor for 5,000 ft drill program at Excelsior Springs","bullets":["Contractor secured for planned 5,000-foot reverse circulation drill program at Excelsior Springs gold project in Nevada.","Contractor plans to mobilize before end of March 2022; BLM permit approved for 6 drill pads and 11 RC holes.","Additional 9 RC drill holes planned on patented claims under lease with a private party.","Program aims to expand known mineralization at the historic Buster mine area.","CEO John Power notes location in Walker Lane Trend, historic gold production exceeding 20 Moz."],"urls":{"canonical":"https://secwatch.observer/filing/0001683168-22-001522","json":"https://secwatch.observer/filing/0001683168-22-001522.json","markdown":"https://secwatch.observer/filing/0001683168-22-001522.md","text":"https://secwatch.observer/filing/0001683168-22-001522.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1304409/000168316822001522/0001683168-22-001522-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1304409/000168316822001522/athenagold_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-27T00:40:29.955897+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}