{"schema_version":"secwatch.filing_event.v1","accession":"0001683168-24-004168","form_type":"8-K","ticker":"AHNRF","cik":"0001304409","company_name":"ATHENA GOLD CORP","filed_at":"2024-06-13T23:59:59+00:00","discovered_at":"2026-05-14T18:03:17.779436+00:00","generated_at":"2026-06-01T04:33:12.103871+00:00","sec_items":["1.01","2.01","2.03","3.02","7.01","9.01"],"event_type":"m_and_a","sentiment":"positive","materiality_score":0.55,"calibrated_materiality_score":0.55,"confidence":"high","headline":"Athena Gold acquires historic Blue Dick Mine for $45,000 and 3% NSR","bullets":["Acquisition expands Excelsior Springs Project to 1,675 hectares (4,140 acres) in Walker Lane Trend, Nevada.","Total consideration: $45,000 cash plus 3% NSR; $10,000 paid, $15,000 due July 1, $20,000 due Aug 1, 2024.","CEO John Power provides $100,000 unsecured loan via promissory note at 6% interest, due Jan 2, 2026.","Issues 600,000 bonus shares at CDN $0.05 to directors/CFO; settles $15,000 debt with 300,000 shares."],"urls":{"canonical":"https://secwatch.observer/filing/0001683168-24-004168","json":"https://secwatch.observer/filing/0001683168-24-004168.json","markdown":"https://secwatch.observer/filing/0001683168-24-004168.md","text":"https://secwatch.observer/filing/0001683168-24-004168.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1304409/000168316824004168/0001683168-24-004168-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1304409/000168316824004168/athenagold_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-01T04:33:12.103871+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"2e6b4bd3f846dc146435f63b6a6201765d5867f5","claim":"ATHENA GOLD CORP completed an acquisition involving Silver Reserve Inc. for US $45,000 in cash and a 3% NSR (closed 2024-06-01).","evidence_excerpt":"related mineral claims (“BD”), together with certain technical data relating to the mining claims (the “Purchased Assets”). Total consideration consists of an aggregate of US $45,000 in cash and a 3% NSR. This acquisition expands our flagship Excelsior Springs Project located in the Walker Lane Trend, Nevada. area to 1,675 hectares (4,140 acres). A copy of the","evidence_source":"SEC 8-K Item 2.01/5.01","evidence_url":"https://www.sec.gov/Archives/edgar/data/1304409/000168316824004168/0001683168-24-004168-index.htm","confidence":0.9,"family_label":"M&A Transactions","details":[{"label":"Action","value":"acquisition"},{"label":"Counterparty","value":"Silver Reserve Inc."},{"label":"Consideration","value":"US $45,000 in cash and a 3% NSR"},{"label":"Closing","value":"2024-06-01"}],"fact_type":"ma_transaction"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}