{"schema_version":"secwatch.filing_event.v1","accession":"0001683168-26-002860","form_type":"8-K","ticker":null,"cik":"0001474558","company_name":"Golkor Inc.","filed_at":"2026-04-13T23:59:59+00:00","discovered_at":"2026-05-14T18:02:32.332916+00:00","generated_at":"2026-05-15T06:34:00.643443+00:00","sec_items":["1.01","5.02","9.01"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.6,"calibrated_materiality_score":0.6,"confidence":"high","headline":"Golkor enters prepay offtake with AMI for 2.5M oz silver; Trafigura contract; CFO appointed","bullets":["Golkor terminated joint venture with AMI; instead signed prepay offtake for 100% of silver bullion from EBM Facility for 3 years, minimum 2.5M oz.","AMI may request up to $20M prepayments; EBM Facility estimated to contain 8M oz silver, 170K tons zinc, 50K tons lead.","Golkor and Trafigura signed purchase contract for silver bullion from EBM Facility; min 2.5M oz, LBMA pricing; contingent on AMI's purchase.","Robert Armstrong appointed CFO effective March 27, 2026; 20+ years CFO experience, former Deloitte auditor."],"urls":{"canonical":"https://secwatch.observer/filing/0001683168-26-002860","json":"https://secwatch.observer/filing/0001683168-26-002860.json","markdown":"https://secwatch.observer/filing/0001683168-26-002860.md","text":"https://secwatch.observer/filing/0001683168-26-002860.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/golkor_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-15T06:34:00.643443+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"54ca89c40d8ee6928b1026c6cfa33e80cab30709","claim":"Golkor Inc. entered into Prepay Offtake Agreement with Afrikor Metal Industries (Pty) Ltd. valued at AMI will sell to Golkor 100% of Silver Bullion produced from Total Production for three years, but n (effective 2026-03-10).","evidence_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","evidence_source":"SEC 8-K Item 1.01/1.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","confidence":0.9},{"claim_id":"b20c556c0a775f461f0def9d6b6a5a5b19174c98","claim":"Golkor Inc. amended Prepay Offtake Agreement Addendum with Afrikor Metal Industries (Pty) Ltd. valued at The Prepay Offtake Agreement was amended on April 3, 2026. (effective 2026-04-03).","evidence_excerpt":"Afrikor Metal Industries (Pty) Ltd. On March 10, 2026, Golkor Inc. (the “Company”) entered into a prepay offtake agreement (the “Prepay Offtake Agreement”) with Afrikor Metal Industries (Pty) Ltd.","evidence_source":"SEC 8-K Item 1.01/1.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","confidence":0.9},{"claim_id":"e75039a4dcfa8c469693302ca2237c6e7d9b7925","claim":"Golkor Inc. entered into Purchase Contract with Trafigura Pte Ltd. valued at Trafigura will purchase silver bullion produced from the EBM Facility after further refining. The Co (effective 2026-02-24).","evidence_excerpt":"On February 24, 2026, Golkor Inc. (the \"Company\") and Trafigura Pte Ltd. (\"Trafigura\") entered into a purchase contract (the \"Purchase Contract\") whereby Trafigura will purchase silver bullion produced from the EBM Facility after further refining.","evidence_source":"SEC 8-K Item 1.01/1.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","confidence":0.9}],"comparable_filings":[{"accession":"0001829126-26-004879","ticker":"SAGU","company_name":"Shreya Acquisition Group","filed_at":"2026-05-11T23:59:59+00:00","headline":"Shreya Acquisition Group closes $110M IPO, 11M units at $10 each on NYSE","event_type":"other_material","sec_items":["1.01","3.02","5.02","5.03","8.01","9.01"],"materiality_score":0.7,"calibrated_materiality_score":0.7,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 5.02, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001829126-26-004879","json":"https://secwatch.observer/filing/0001829126-26-004879.json","markdown":"https://secwatch.observer/filing/0001829126-26-004879.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/2083452/000182912626004879/0001829126-26-004879-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/2083452/000182912626004879/shreyaacq_8k.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"Private Units Subscription Agreement, dated May 6, 2026, by and between the Company and the Sponsor, a copy of which is attached as Exhibit 10.4 and incorporated herein by reference","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/2083452/000182912626004879/0001829126-26-004879-index.htm"}},{"accession":"0001213900-26-053865","ticker":"QUCY","company_name":"Quantum Cyber N.V.","filed_at":"2026-05-08T23:59:59+00:00","headline":"Quantum Cyber increases equity distribution capacity to $100M; CFO Caragol moves to consulting role","event_type":"other_material","sec_items":["1.01","5.02","9.01"],"materiality_score":0.65,"calibrated_materiality_score":0.65,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 5.02, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001213900-26-053865","json":"https://secwatch.observer/filing/0001213900-26-053865.json","markdown":"https://secwatch.observer/filing/0001213900-26-053865.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/1874252/000121390026053865/0001213900-26-053865-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1874252/000121390026053865/ea0289661-8k_quantum.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"On May 4, 2026, Quantum Cyber N.V. (the “Company”) entered into that certain Amendment No. 1 to Equity Distribution Agreement (“Amendment No. 1”) with Maxim Group LLC (the “Sales Agent”), which amends that certain Equity Distribution Agreement, dated as of October 3, 2025, between the Company and Sales Agent (the “Original Agreement” and, together with Amendment No. 1, the “Sales Agreement”).","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/1874252/000121390026053865/0001213900-26-053865-index.htm"}},{"accession":"0001213900-26-064037","ticker":"OSRH","company_name":"OSR Holdings, Inc.","filed_at":"2026-06-02T17:16:53+00:00","headline":"OSR Holdings enters $30M asset purchase agreement with subsidiary Vaximm for VXM01 IP","event_type":"other_material","sec_items":["1.01","9.01"],"materiality_score":0.65,"calibrated_materiality_score":0.65,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001213900-26-064037","json":"https://secwatch.observer/filing/0001213900-26-064037.json","markdown":"https://secwatch.observer/filing/0001213900-26-064037.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/1840425/000121390026064037/0001213900-26-064037-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1840425/000121390026064037/ea0293037-8k_osrhold.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"On May 27, 2026, OSR Holdings, Inc. (the “Company”) entered into an Asset Purchase Agreement (the “Asset Purchase Agreement”) with Vaximm AG (“Vaximm”), a clinical-stage biopharmaceutical company organized under the laws of Switzerland.","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/1840425/000121390026064037/0001213900-26-064037-index.htm"}},{"accession":"0001213900-26-063834","ticker":"VTIX","company_name":"Virtuix Holdings Inc.","filed_at":"2026-06-02T13:15:39+00:00","headline":"Virtuix amends warrants to $4.00 exercise price, extends period to July 27, 2026","event_type":"other_material","sec_items":["1.01","7.01","9.01"],"materiality_score":0.6,"calibrated_materiality_score":0.6,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001213900-26-063834","json":"https://secwatch.observer/filing/0001213900-26-063834.json","markdown":"https://secwatch.observer/filing/0001213900-26-063834.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/1606242/000121390026063834/0001213900-26-063834-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1606242/000121390026063834/ea0292972-8k_virtuix.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"On June 1, 2026, Virtuix Holdings Inc. (the “Company”) entered into amendments to each of the following warrants to purchase shares of Class A Common Stock (collectively, the “Warrant Amendments”) with Streeterville Capital, LLC (the “Investor”) amending the exercise price and extending the Reduced Exercise Price Period (as defined below) to each such warrant","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/1606242/000121390026063834/0001213900-26-063834-index.htm"}},{"accession":"0001193125-26-252560","ticker":"CURB","company_name":"Curbline Properties Corp.","filed_at":"2026-06-02T12:07:02+00:00","headline":"Curbline Properties enters up to $400M ATM equity offering; prior program terminated","event_type":"other_material","sec_items":["1.01","9.01"],"materiality_score":0.55,"calibrated_materiality_score":0.55,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001193125-26-252560","json":"https://secwatch.observer/filing/0001193125-26-252560.json","markdown":"https://secwatch.observer/filing/0001193125-26-252560.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/2027317/000119312526252560/0001193125-26-252560-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/2027317/000119312526252560/d111894d8k.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"On June 2, 2026, Curbline Properties Corp. (the “ Company ”) and Curbline Properties LP (the “ Operating Partnership ”) entered into an ATM Equity Offering Sales Agreement (the “ Equity Sales Agreement ”) with Jefferies LLC, BNY Mellon Capital Markets, LLC, BofA Securities, Inc., BTIG, LLC, Capital One Securities, Inc., Goldman Sachs & Co. LLC, KeyBanc Capital Markets Inc., Morgan Stanley & Co. LLC, Nomura Securities International, Inc., StoneX Financial Inc. and Wells Fargo Securities, LLC, as sales agents","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/2027317/000119312526252560/0001193125-26-252560-index.htm"}},{"accession":"0001213900-26-063767","ticker":"BJDX","company_name":"Bluejay Diagnostics, Inc.","filed_at":"2026-06-02T10:30:41+00:00","headline":"Bluejay Diagnostics partners with Argonaut for US-based Symphony platform manufacturing","event_type":"other_material","sec_items":["1.01","7.01","9.01"],"materiality_score":0.55,"calibrated_materiality_score":0.55,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001213900-26-063767","json":"https://secwatch.observer/filing/0001213900-26-063767.json","markdown":"https://secwatch.observer/filing/0001213900-26-063767.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/1704287/000121390026063767/0001213900-26-063767-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1704287/000121390026063767/ea0293118-8k_bluejay.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"On May 27, 2026, Bluejay Diagnostics, Inc. (the “Company”) entered into an agreement and statement of work (together, the “Agreement”) with Argonaut Manufacturing Services c/o Argonaut, Inc. (“Argonaut”) regarding the provision by Argonaut to the Company of certain manufacturing services to support the Company’s SymphonyTM platform.","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/1704287/000121390026063767/0001213900-26-063767-index.htm"}},{"accession":"0001193125-26-252407","ticker":"FLY","company_name":"Firefly Aerospace Inc.","filed_at":"2026-06-02T10:21:08+00:00","headline":"Firefly Aerospace prices secondary offering of 12M shares at $48.00 per share","event_type":"other_material","sec_items":["1.01","9.01"],"materiality_score":0.7,"calibrated_materiality_score":0.7,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001193125-26-252407","json":"https://secwatch.observer/filing/0001193125-26-252407.json","markdown":"https://secwatch.observer/filing/0001193125-26-252407.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/1860160/000119312526252407/0001193125-26-252407-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1860160/000119312526252407/d156539d8k.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"On May 28, 2026, in connection with the pricing of the Offering, the Company entered into an underwriting agreement (the \"Underwriting Agreement\") with Goldman Sachs & Co. LLC, J.P. Morgan Securities LLC, Jefferies LLC and Wells Fargo Securities, LLC, as representatives of the several underwriters listed on Schedule I thereto","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/1860160/000119312526252407/0001193125-26-252407-index.htm"}},{"accession":"0001140361-26-023619","ticker":"GNK","company_name":"GENCO SHIPPING & TRADING LTD","filed_at":"2026-06-02T10:01:31+00:00","headline":"Genco Shipping amends shareholder rights plan, eliminates 'Acting in Concert' definition","event_type":"other_material","sec_items":["1.01","3.03","9.01"],"materiality_score":0.55,"calibrated_materiality_score":0.55,"match_reasons":["same fact type: material_agreement","same SEC item: 1.01, 9.01","same event type: other_material","similar materiality"],"urls":{"canonical":"https://secwatch.observer/filing/0001140361-26-023619","json":"https://secwatch.observer/filing/0001140361-26-023619.json","markdown":"https://secwatch.observer/filing/0001140361-26-023619.md","edgar_index":"https://www.sec.gov/Archives/edgar/data/1326200/000114036126023619/0001140361-26-023619-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1326200/000114036126023619/ef20075333_8k.htm"},"side_by_side_evidence":{"fact_type":"material_agreement","source_excerpt":"On March 10, 2026, Golkor Inc. (the \"Company\") entered into a prepay offtake agreement (the \"Prepay Offtake Agreement\") with Afrikor Metal Industries (Pty) Ltd. (\"AMI\") to purchase certain production from EBM Tailing and Industrial Processing Facility (the \"EBM Facility\") upon completion of its purchase by AMI.","source_evidence_url":"https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm","comparable_excerpt":"On June 2, 2026, Genco Shipping & Trading Limited (the “ Company ”) entered into the Third Amendment to Shareholders Rights Agreement (the “ Third Amendment ”) to amend the Shareholder Rights Agreement, dated as of October 1, 2025 between the Company and Computershare Inc., as amended to date (the “ Rights Agreement ”).","comparable_evidence_url":"https://www.sec.gov/Archives/edgar/data/1326200/000114036126023619/0001140361-26-023619-index.htm"}}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}