---
schema_version: "secwatch.filing_event.v1"
accession: "0001683168-26-002860"
form_type: "8-K"
ticker: null
cik: "0001474558"
company_name: "Golkor Inc."
filed_at: "2026-04-13T23:59:59+00:00"
generated_at: "2026-05-15T06:34:00.643443+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# Golkor enters prepay offtake with AMI for 2.5M oz silver; Trafigura contract; CFO appointed

## Summary
- Golkor terminated joint venture with AMI; instead signed prepay offtake for 100% of silver bullion from EBM Facility for 3 years, minimum 2.5M oz.
- AMI may request up to $20M prepayments; EBM Facility estimated to contain 8M oz silver, 170K tons zinc, 50K tons lead.
- Golkor and Trafigura signed purchase contract for silver bullion from EBM Facility; min 2.5M oz, LBMA pricing; contingent on AMI's purchase.
- Robert Armstrong appointed CFO effective March 27, 2026; 20+ years CFO experience, former Deloitte auditor.

## SEC filing metadata
- accession: 0001683168-26-002860
- form_type: 8-K
- cik: 0001474558
- company_name: Golkor Inc.
- filed_at: 2026-04-13T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 1.01, 5.02, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/golkor_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001683168-26-002860
- JSON: https://secwatch.observer/filing/0001683168-26-002860.json
- Plain text: https://secwatch.observer/filing/0001683168-26-002860.txt

## Source-grounded claims
- claim_id: 54ca89c40d8ee6928b1026c6cfa33e80cab30709
  claim: Golkor Inc. entered into Prepay Offtake Agreement with Afrikor Metal Industries (Pty) Ltd. valued at AMI will sell to Golkor 100% of Silver Bullion produced from Total Production for three years, but n (effective 2026-03-10).
  evidence_excerpt: On March 10, 2026, Golkor Inc. (the "Company") entered into a prepay offtake agreement (the "Prepay Offtake Agreement") with Afrikor Metal Industries (Pty) Ltd. ("AMI") to purchase certain production from EBM Tailing and Industrial Processing Facility (the "EBM Facility") upon completion of its purchase by AMI.
  evidence_url: https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm
- claim_id: b20c556c0a775f461f0def9d6b6a5a5b19174c98
  claim: Golkor Inc. amended Prepay Offtake Agreement Addendum with Afrikor Metal Industries (Pty) Ltd. valued at The Prepay Offtake Agreement was amended on April 3, 2026. (effective 2026-04-03).
  evidence_excerpt: Afrikor Metal Industries (Pty) Ltd. On March 10, 2026, Golkor Inc. (the “Company”) entered into a prepay offtake agreement (the “Prepay Offtake Agreement”) with Afrikor Metal Industries (Pty) Ltd.
  evidence_url: https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm
- claim_id: e75039a4dcfa8c469693302ca2237c6e7d9b7925
  claim: Golkor Inc. entered into Purchase Contract with Trafigura Pte Ltd. valued at Trafigura will purchase silver bullion produced from the EBM Facility after further refining. The Co (effective 2026-02-24).
  evidence_excerpt: On February 24, 2026, Golkor Inc. (the "Company") and Trafigura Pte Ltd. ("Trafigura") entered into a purchase contract (the "Purchase Contract") whereby Trafigura will purchase silver bullion produced from the EBM Facility after further refining.
  evidence_url: https://www.sec.gov/Archives/edgar/data/1474558/000168316826002860/0001683168-26-002860-index.htm

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
