{"schema_version":"secwatch.filing_event.v1","accession":"0001683168-26-004194","form_type":"8-K","ticker":"ZSQR","cik":"0001759186","company_name":"Z Squared Inc.","filed_at":"2026-05-20T23:56:08+00:00","discovered_at":"2026-05-21T10:05:01.200297+00:00","generated_at":"2026-05-21T10:17:11.215773+00:00","sec_items":["7.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.7,"confidence":"high","headline":"Z Squared outlines Phase 1 plan to reach 100 MW AI-ready capacity; signs binding LOI for Skycore acquisition","bullets":["Phase 1 goal: 100 MW of AI-ready capacity over 18 months across multiple U.S. sites.","Signed binding LOI to acquire Skycore Digital (North Carolina sites) with up to 42 MW potential capacity.","Skycore has 24 MW energized capacity plus 18 MW via Duke Energy Letters of Authorization.","Company virtually debt-free after April 2026 Nasdaq listing; evaluating additional acquisition targets.","Strategy: acquire operating sites with existing power and convert to AI inference infrastructure."],"urls":{"canonical":"https://secwatch.observer/filing/0001683168-26-004194","json":"https://secwatch.observer/filing/0001683168-26-004194.json","markdown":"https://secwatch.observer/filing/0001683168-26-004194.md","text":"https://secwatch.observer/filing/0001683168-26-004194.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1759186/000168316826004194/0001683168-26-004194-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1759186/000168316826004194/zsquared_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-21T10:17:11.215773+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}