other material
confidence high
sentiment neutral
materiality 0.70
Alpha 2026 guidance: met coal shipments 14.4-15.4M tons, cost per ton $95-$101
Alpha Metallurgical Resources, Inc.
- Met coal shipments expected 14.4-15.4M tons; thermal 0.7-1.1M tons; total 15.1-16.5M tons.
- Cost of coal sales per ton: $95-$101, includes Section 45X credit impact.
- Capital expenditures $148-$168M including Kingston Wildcat mine development.
- Committed/priced: met 24% at $136.75/ton, thermal 68% at $76.25/ton, overall met segment 27% at $128.16/ton.
- Net cash interest income $2-$6M, DD&A $160-$174M, cash tax rate 0%-5%.