---
schema_version: "secwatch.filing_event.v1"
accession: "0001760689-22-000115"
form_type: "8-K"
ticker: "MVST"
cik: "0001760689"
company_name: "Microvast Holdings, Inc."
filed_at: "2022-12-07T23:59:59+00:00"
generated_at: "2026-06-21T08:14:06.530467+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# Microvast wins 1.2GWh battery storage supply contract for US solar co-located project

## Summary
- Microvast to supply ME-4300 BESS containers (4.3MWh each, >10,000 cycles) for a 1.2GWh utility-scale project co-located with solar in the US.
- Shipments begin 2023; commercial operation expected 2024.
- Battery cells from Clarksville, TN facility qualify as domestic content under IRA, enhancing project benefits.
- Contract expected to utilize significant capacity at Microvast's Clarksville cell manufacturing plant.
- Project positions Microvast as leader in utility-scale energy storage market.

## SEC filing metadata
- accession: 0001760689-22-000115
- form_type: 8-K
- ticker: MVST
- cik: 0001760689
- company_name: Microvast Holdings, Inc.
- filed_at: 2022-12-07T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1760689/000176068922000115/0001760689-22-000115-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1760689/000176068922000115/mvst-20221207.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001760689-22-000115
- JSON: https://secwatch.observer/filing/0001760689-22-000115.json
- Plain text: https://secwatch.observer/filing/0001760689-22-000115.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
