---
schema_version: "secwatch.filing_event.v1"
accession: "0001819848-23-000339"
form_type: "8-K"
ticker: "JOBY"
cik: "0001819848"
company_name: "Joby Aviation, Inc."
filed_at: "2023-09-18T23:59:59+00:00"
generated_at: "2026-06-10T15:10:38.046116+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.8
calibrated_materiality_score: 0.8
confidence: "high"
source: SEC EDGAR
---

# Joby Aviation selects Dayton, Ohio for first scaled manufacturing facility; up to 500 aircraft/year

## Summary
- Plans to invest up to $500M to build facility at Dayton International Airport, creating up to 2,000 jobs.
- Facility capable of delivering up to 500 eVTOL aircraft per year; construction starts 2024, operational 2025.
- Up to $325M in state and local incentives available; invited to apply for DOE Title XVII loan.
- Toyota will continue to advise on scaled production; Joby's HQ and R&D remain in California.
- Selection follows competitive site process; contingent on due diligence, permits, and approvals.

## SEC filing metadata
- accession: 0001819848-23-000339
- form_type: 8-K
- ticker: JOBY
- cik: 0001819848
- company_name: Joby Aviation, Inc.
- filed_at: 2023-09-18T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.8
- calibrated_materiality_score: 0.8
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1819848/000181984823000339/0001819848-23-000339-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1819848/000181984823000339/joby-20230918.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001819848-23-000339
- JSON: https://secwatch.observer/filing/0001819848-23-000339.json
- Plain text: https://secwatch.observer/filing/0001819848-23-000339.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
