{"schema_version":"secwatch.filing_event.v1","accession":"0001819989-25-000003","form_type":"8-K","ticker":"CIFR","cik":"0001819989","company_name":"Cipher Digital Inc.","filed_at":"2025-02-25T23:59:59+00:00","discovered_at":"2026-05-14T18:03:05.060570+00:00","generated_at":"2026-05-26T04:55:02.391197+00:00","sec_items":["2.02","7.01","9.01"],"event_type":"earnings","sentiment":"positive","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"Cipher Mining Q4 net earnings $18M, adjusted $51M; Odessa upgrade to 13.5 EH/s, Stingray acquisition closed","bullets":["Q4 2024 net earnings $18M ($0.05 diluted EPS); adjusted earnings $51M ($0.14 diluted EPS).","Completed Odessa fleet upgrade, raising total self-mining hashrate to ~13.5 EH/s.","Acquired Stingray data center site in West Texas with 100 MW front-of-the-meter capacity.","Acquired 337 acres adjacent to Barber Lake; entered 60-day exclusivity for additional 500 MW HPC data center.","Pipeline grew to 2.8 GW; Black Pearl Phase I (150 MW, ~9.5 EH/s) on track for Q2 2025 energization."],"urls":{"canonical":"https://secwatch.observer/filing/0001819989-25-000003","json":"https://secwatch.observer/filing/0001819989-25-000003.json","markdown":"https://secwatch.observer/filing/0001819989-25-000003.md","text":"https://secwatch.observer/filing/0001819989-25-000003.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/0001819989-25-000003-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/cifr-20250225.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-26T04:55:02.391197+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}