secwatch.observer — SEC 8-K summary ====================================== Issuer: Energy Vault Holdings, Inc. (NRGV) CIK: 0001828536 Form: 8-K Filed at: 2026-01-06T23:59:59+00:00 Accession: 0001828536-26-000003 Event type: other_material Sentiment: positive Materiality: 0.75 Item codes: 2.02, 7.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Energy Vault begins building 150 MW Texas BESS; Q4 cash up 65% to $100M+ ------------------------------------------------------------------------ - SOSA Energy Center (150 MW/300 MWh) construction started in ERCOT; commercial operation expected Q2 2027. - Expected total revenue over $350M over technical life (~$17-20M annual high-margin recurring). - Cash and liquidity increased ~65% in Q4 2025 to over $100M, above guidance high end. - Asset Vault portfolio now over 340 MW under operation/construction; three more projects in pipeline. - Project acquired from Shell subsidiary Savion; backed by $300M OIC preferred equity. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1828536/000182853626000003/0001828536-26-000003-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1828536/000182853626000003/nrgv-20260105.htm HTML page: https://secwatch.observer/filing/0001828536-26-000003 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer