{"schema_version":"secwatch.filing_event.v1","accession":"0001839341-26-000023","form_type":"8-K","ticker":"CORZ","cik":"0001839341","company_name":"Core Scientific, Inc./tx","filed_at":"2026-09-10T11:18:20+00:00","discovered_at":"2026-09-10T11:20:01.568053+00:00","generated_at":"2026-09-10T11:20:20.086929+00:00","sec_items":["7.01"],"event_type":"regulatory","sentiment":"positive","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"high","headline":"Core Scientific gets ERCOT conditional approval for 1,402 MW across three Texas sites","bullets":["Denton: 297 MW existing power conditionally approved as Base Load Pathway (a); 74 MW additional validated in 2025 RTP.","Pecos: 300 MW existing approved as Base Load Pathway (b); 300 MW additional as Studied Load; collateral paid.","Hunt: 431 MW approved as Base Load Advancing Large Load Pathway (e); studies done, collateral posted, construction started.","Total conditional ERCOT power approvals across three Texas sites: 1,402 MW."],"urls":{"canonical":"https://secwatch.observer/filing/0001839341-26-000023","json":"https://secwatch.observer/filing/0001839341-26-000023.json","markdown":"https://secwatch.observer/filing/0001839341-26-000023.md","text":"https://secwatch.observer/filing/0001839341-26-000023.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/0001839341-26-000023-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/core-20260910.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-09-10T11:20:20.086929+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}