---
schema_version: "secwatch.filing_event.v1"
accession: "0001839341-26-000023"
form_type: "8-K"
ticker: "CORZ"
cik: "0001839341"
company_name: "Core Scientific, Inc./tx"
filed_at: "2026-09-10T11:18:20+00:00"
generated_at: "2026-09-10T11:20:20.086929+00:00"
event_type: "regulatory"
sentiment: "positive"
materiality_score: 0.7
calibrated_materiality_score: 0.7
confidence: "high"
source: SEC EDGAR
---

# Core Scientific gets ERCOT conditional approval for 1,402 MW across three Texas sites

## Summary
- Denton: 297 MW existing power conditionally approved as Base Load Pathway (a); 74 MW additional validated in 2025 RTP.
- Pecos: 300 MW existing approved as Base Load Pathway (b); 300 MW additional as Studied Load; collateral paid.
- Hunt: 431 MW approved as Base Load Advancing Large Load Pathway (e); studies done, collateral posted, construction started.
- Total conditional ERCOT power approvals across three Texas sites: 1,402 MW.

## SEC filing metadata
- accession: 0001839341-26-000023
- form_type: 8-K
- ticker: CORZ
- cik: 0001839341
- company_name: Core Scientific, Inc./tx
- filed_at: 2026-09-10T11:18:20+00:00
- event_type: regulatory
- sentiment: positive
- materiality_score: 0.7
- calibrated_materiality_score: 0.7
- confidence: high
- sec_items: 7.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/0001839341-26-000023-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/core-20260910.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001839341-26-000023
- JSON: https://secwatch.observer/filing/0001839341-26-000023.json
- Plain text: https://secwatch.observer/filing/0001839341-26-000023.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
