{"schema_version":"secwatch.filing_event.v1","accession":"0001845437-24-000038","form_type":"8-K","ticker":"NPWR","cik":"0001845437","company_name":"NET Power Inc.","filed_at":"2024-08-12T23:59:59+00:00","discovered_at":"2026-05-14T18:03:14.869622+00:00","generated_at":"2026-05-31T10:08:52.656035+00:00","sec_items":["2.02","9.01"],"event_type":"earnings","sentiment":"positive","materiality_score":0.55,"calibrated_materiality_score":0.55,"confidence":"high","headline":"NET Power Q2 2024 cash $609M, advances La Porte testing and Project Permian","bullets":["Q2 operating cash outflow ~$8M, capex ~$8M; total cash $609M vs $626M at Q1 2024.","First phase of Baker Hughes equipment validation at La Porte on track for Q4 2024; test rig ships Q3 2024.","Project Permian FEED concludes Q4 2024; signed LNTP with Baker Hughes for utility-scale turboexpander long-lead materials.","Filed MISO interconnection for originated project OP1; Class VI permit applications submitted for sequestration.","Initial power generation for Project Permian still expected H2 2027–H1 2028."],"urls":{"canonical":"https://secwatch.observer/filing/0001845437-24-000038","json":"https://secwatch.observer/filing/0001845437-24-000038.json","markdown":"https://secwatch.observer/filing/0001845437-24-000038.md","text":"https://secwatch.observer/filing/0001845437-24-000038.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1845437/000184543724000038/0001845437-24-000038-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1845437/000184543724000038/npwr-20240812.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-31T10:08:52.656035+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}