{"schema_version":"secwatch.filing_event.v1","accession":"0001845437-25-000026","form_type":"8-K","ticker":"NPWR","cik":"0001845437","company_name":"NET Power Inc.","filed_at":"2025-05-12T23:59:59+00:00","discovered_at":"2026-05-14T18:02:50.110294+00:00","generated_at":"2026-05-22T00:26:40.963717+00:00","sec_items":["2.02","9.01"],"event_type":"earnings","sentiment":"positive","materiality_score":0.65,"calibrated_materiality_score":0.65,"confidence":"high","headline":"Net Power reports Q1 2025 with over $500M cash; testing on track","bullets":["Ended Q1 with over $500M in cash, cash equivalents and investments to fund tech development and testing.","Project Permian post-FEED cost reduction work ongoing to deliver a financeable first commercial facility.","Modular multi-unit feasibility study aims to reduce LCOE and meet demand for larger capacity.","La Porte testing: Phases 1-2 expected completed in 2025; Phases 3-4 by 2027 using existing balance sheet.","Phase 1 testing resumed in Q2 after unplanned downtime; site repairs underway."],"urls":{"canonical":"https://secwatch.observer/filing/0001845437-25-000026","json":"https://secwatch.observer/filing/0001845437-25-000026.json","markdown":"https://secwatch.observer/filing/0001845437-25-000026.md","text":"https://secwatch.observer/filing/0001845437-25-000026.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1845437/000184543725000026/0001845437-25-000026-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1845437/000184543725000026/npwr-20250512.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-22T00:26:40.963717+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}