{"schema_version":"secwatch.filing_event.v1","accession":"0001845437-25-000052","form_type":"8-K","ticker":"NPWR","cik":"0001845437","company_name":"NET Power Inc.","filed_at":"2025-08-11T23:59:59+00:00","discovered_at":"2026-05-14T18:02:45.327130+00:00","generated_at":"2026-05-17T15:43:06.767034+00:00","sec_items":["2.02","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.6,"calibrated_materiality_score":0.6,"confidence":"high","headline":"Net Power reports Q2 cash $475M; Project Permian LCOE below $100/MWh","bullets":["Cash, cash equivalents and investments of $475M as of June 30, 2025.","Project Permian LCOE target below $100/MWh, improved >33% via integrated gas turbine product configuration.","SN1 total installed cost reduced to $1.6-1.9 billion while preserving performance.","Expanded 45Q credits and reinstated bonus depreciation yield ~$20/MWh LCOE improvement at Project Permian.","La Porte facility resumed testing; over 150 hours completed in July; Phase 1 testing expected in 2025."],"urls":{"canonical":"https://secwatch.observer/filing/0001845437-25-000052","json":"https://secwatch.observer/filing/0001845437-25-000052.json","markdown":"https://secwatch.observer/filing/0001845437-25-000052.md","text":"https://secwatch.observer/filing/0001845437-25-000052.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1845437/000184543725000052/0001845437-25-000052-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1845437/000184543725000052/npwr-20250811.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-17T15:43:06.767034+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}