---
schema_version: "secwatch.filing_event.v1"
accession: "0001845437-26-000031"
form_type: "8-K"
ticker: "NPWR"
cik: "0001845437"
company_name: "NET Power Inc."
filed_at: "2026-08-13T20:23:04+00:00"
generated_at: "2026-08-13T20:24:23.988088+00:00"
event_type: "earnings"
sentiment: "neutral"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# Net Power shifts to unabated gas, holds $310M cash, orders 68 MW turbines for Project Permian

## Summary
- Q2 2026: $310M cash, cash equivalents, and investments as of June 30, 2026.
- Strategic pivot to fast-to-deploy unabated natural gas power; carbon capture deferred to later phases.
- Contracted two modular gas turbine generator sets (~68 MW gross) for Project Permian.
- Revising arrangement with Entropy after LOI expiration; PCC may be added in future phases.
- Liquidity sufficient for 12 months; no project-level financing committed for Project Permian.

## SEC filing metadata
- accession: 0001845437-26-000031
- form_type: 8-K
- ticker: NPWR
- cik: 0001845437
- company_name: NET Power Inc.
- filed_at: 2026-08-13T20:23:04+00:00
- event_type: earnings
- sentiment: neutral
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 2.02, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1845437/000184543726000031/0001845437-26-000031-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1845437/000184543726000031/npwr-20260813.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001845437-26-000031
- JSON: https://secwatch.observer/filing/0001845437-26-000031.json
- Plain text: https://secwatch.observer/filing/0001845437-26-000031.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
