other material
confidence high
sentiment positive
materiality 0.60
D-Wave and BASF complete proof-of-concept; hybrid-quantum app cuts scheduling from 10 hours to seconds
D-Wave Quantum Inc.
- Scheduling time reduced from 10 hours (classical solver) to 5 seconds using hybrid-quantum application.
- Application reduced lateness by 14%, setup times by 9%, tank unloading up to 18% vs. existing solution.
- BASF collaborated to optimize liquid-filling facility; results exceeded expectations per BASF scientists.
- D-Wave sees milestone for deploying hybrid-quantum in manufacturing and supply chain industries.