---
schema_version: "secwatch.filing_event.v1"
accession: "0001997652-24-000003"
form_type: "8-K"
ticker: "TBN"
cik: "0001997652"
company_name: "Tamboran Resources Corp"
filed_at: "2024-11-12T23:59:59+00:00"
generated_at: "2026-05-30T02:20:48.242300+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# Tamboran Q1 FY25 ops: cash US$74M, SS-2H sidetrack, on track for IP30 flow tests in 1Q 2025

## Summary
- SS-2H well reached 20,669 ft TD but sidetracked due to downhole issue; SS-2H ST1 achieved record drilling rates below Moroak Sandstone.
- SS-3H well to start drilling Nov 2024; both wells to be stimulated with up to 60 stages each using Liberty Energy frac fleet.
- Cash balance US$74.0M at Sept 30, 2024; US$7.6M net from rig sale received in Oct 2024. No debt.
- Awarded Bechtel pre-FEED for NTLNG project; contracted Enscope for Sturt Plateau Compression Facility long lead items.
- IP30 flow tests targeted for 1Q 2025; binding transportation agreements with APA Group for Sturt Plateau Pipeline on track.

## SEC filing metadata
- accession: 0001997652-24-000003
- form_type: 8-K
- ticker: TBN
- cik: 0001997652
- company_name: Tamboran Resources Corp
- filed_at: 2024-11-12T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 2.02, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1997652/000199765224000003/0001997652-24-000003-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1997652/000199765224000003/trc-20241112.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001997652-24-000003
- JSON: https://secwatch.observer/filing/0001997652-24-000003.json
- Plain text: https://secwatch.observer/filing/0001997652-24-000003.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
