other material
confidence high
sentiment positive
materiality 0.80
Soluna completes 48 MW Project Dorothy 2; total capacity rises to 123 MW
Soluna Holdings, Inc
- Project Dorothy 2 fully energized at 48 MW, on time and on budget; total campus now 98 MW.
- Total energized capacity increased 73.3% since April 2025 to 123 MW, over 5 EH/s compute.
- Operating metrics: >30,000 mining rigs, >3.9 EH/s hashrate, 24 J/TH efficiency, >94% uptime.
- Annual energy consumption ~80,000 MWh of curtailed wind energy at $32.5/MWh; 18 local jobs.
- Next project: 166 MW Project Kati currently under construction for future expansion.